TCP_IEA_LOGO

Yes, Inform me when...

Minimization of the kWh cost by optimization of an all-electric chain for the SEAREV Wave Energy Converter.

Date: November 04, 2013 at 16:53 GMT

This article presents a two-step approach for the design of a Wave Energy Converter (WEC) electric chain. We show how it is possible, from a bi-objective optimization, to determine the results of several single-objective optimization strategies, in the aim of minimizing the per-kWh production cost. The discussion addresses the influence of operating cycle choice on optimization results, with special attention shown to developing the per-kWh cost of electricity generated. 




The OES is organised under the auspices of the International Energy Agency (IEA) but is functionally and legally autonomous. Views, findings and publications of the OES do not necessarily represent the views or policies of the IEA Secretariat or its individual member countries.